In addition to the Secretaría de Comunicaciones y Transportes (SCT), the Secretaría de Energía (SENER) (Secretariat/Ministry of Energy) is also responsible for the planning. The project managers awarded the contract for the construction and equipment of the route to a consortium of several companies.
Almost the entire route runs above ground, with the track elevated on concrete supports. Only a section of 4.7 kilometres runs underground through the tunnelled mountain landscape of the Sierra de las Cruces. For this, a twin-tube tunnel is being constructed. Its two tubes consist of prefabricated concrete elements. To meet safety criteria, the planners have provided emergency walkways in the tunnel. These lead passengers to the emergency exits. This allows people in dangerous situations to leave the tunnel. These walkways were reinforced with steel plates, which are securely fixed in concrete using fischer FAZ II bolt anchors in size 20/60.