With an architectural height of 220.67 metres, Olszynki Park sets new benchmarks in Polish high-rise construction. The project replaces the previous record holder, the Wrocław Sky Tower (212 metres), at the top. The prominent building height, construction volume and sophisticated architecture required anchoring solutions with maximum load-bearing capacity. Mechanical and chemical fixing systems from fischer ensure permanent load transfer in different substrates and reliably protect the building structure against dynamic forces.

„The choice of fastening technology is far more than an implementation detail – it is a key safety factor for the entire structure. That is why the companies responsible chose our proven systems, which are used wherever reliability and the consistent implementation of planning are the highest priority.“ says Artur Hoffman, Country Manager of fischer Poland.

Large-scale projects can only succeed through reliable interfaces between manufacturers and installation contractors. The executing company Reconal has been working closely with fischer for over a decade. Roman Kotuła, Project Manager at Reconal, reveals: „Two factors are decisive for us when choosing fischer: the high quality of the products and the comprehensive technical support – from installation optimisation to the assistance provided by fischer engineers with complex technical calculations.“ The close integration of both partners made a significant contribution to accelerating work processes and implementing the required quality standards on schedule.

At great heights, enormous wind forces act on the façade. The direction and intensity of the loads vary constantly. Pressure and suction forces place particular stress on the façade elements and the intermediate areas between floors. Every anchoring must safely transfer these changing horizontal loads into the structure. Faulty fixings pose significant risks to the building fabric and the surrounding urban space. fischer systems provide the required structural safety throughout the entire service life.

Due to the different building materials used in the structure, two specialised fischer fastening solutions were used.
Secure heavy-duty anchoring in reinforced concrete: For load-bearing connections in concrete, those responsible selected the FAZ II Plus bolt anchor. The proven expansion anchor bears the full load immediately after installation. Its European Technical Assessments (ETAs) guarantee maximum installation safety. Thanks to numerous diameter variants and anchorage depths, the system could be flexibly adapted to the structural requirements.
Load transfer without expansion pressure in aerated concrete: Due to its porous structure, a chemical system was suitable for aerated concrete. The FIS V Plus universal injection mortar fills the drill hole completely without voids. Once cured, the mortar forms a high-strength bond with the building material. This prevents expansion pressures in the porous base material, protects against edge breakouts and offers high resistance to dynamic loads and vibrations.

For a high-rise of this scale, there is no room for chance.
Standardised fastening solutions significantly simplify day-to-day work on construction sites. Structured technical documentation, clearly understandable installation instructions and coordinated tools reduced the installation effort at Olszynki Park. The installation teams were able to carry out anchorages quickly, without errors and in a verifiable manner. This reduced installation times and ensured the project progressed on schedule for this major development.