The Guiyang Metro Line 1 was under construction from 2014 to 2018. Upon completion, it will run from the northwest to the south of the capital of the southwestern Chinese province of Guizhou. The route will include a total of 24 stations over a length of 34 km.

“During the construction of the underground railway, the construction participants were faced with complex geological and hydrological conditions as well as natural disasters such as earthquakes,” describes Jiang Zong, Managing Director of fischer China, outlining the framework conditions. “Therefore, it was important to select high-quality products that meet the high requirements. After intensive consultation, the experts quickly recognised the great advantages of the products and services from fischer.” The specialist partners benefited from the one-stop solutions, with which all fastening projects could be implemented safely, economically, and in a manner friendly to installation. These included the installation of electrical lines, communication systems, protective doors, and fire extinguishing systems. In total, the installers used the fischer injection mortar FIS HB around 60,000 times with the powerfully expanding composite anchor FHB to fix the brackets of the contact network for the power supply of electric vehicles and stationary facilities. The system achieves the highest load values in cracked concrete, which reduces the number of fastening points and the size of anchor plates required.
The fischer Zykon undercut anchor FZA was used with approximately 660,000 sets to secure the mounts for the ring network and communication systems. With its special undercut technology, the fastener ensures secure connections and maximum safety. After inserting the anchor, the expansion sleeve is driven over the cone with the corresponding setting tool, filling the undercut drilled hole form-fittingly. Another 20,000 FZA anchors were installed by the installers for the attachment of fire extinguishing systems. The fischer internal thread anchor RG M was used 12,000 times in combination with the injection mortar FIS EM to fasten the protective doors. The system allows maximum load transfer in cracked concrete and is also approved for seismic applications.   Previously, fischer was already involved in several projects for the expansion of the Beijing S-Bahn network. These included lines 6, 8, 9, 10, 14, 15, 16, the airport line, and also the subway line S1. The company also supported the construction and expansion of many other rail transport routes in Beijing, Shanghai, Guangzhou, Shenzhen, Wuxi, Wuhan, Tianjin, Shenzhen, Ningbo, and other cities. With suitable product and service offerings, fischer, through its Chinese subsidiary, accompanies its customers in the Middle Kingdom throughout the entire construction process.

Project Profile Guiyang Metro Line 1

Client:
Guiyang Urban Rail Transit Co., Ltd.
Construction companies:
No.5 Engineering Corporation Limited of CR20G
Architect / Planner:
China Railway No. 2 Engineering Group Co., Ltd.
Installation companies:
China Railway 11th Bureau Group Electric Engineering Co., Ltd. Beijing Dinghan Technology Co., Ltd. China CREC Railway Electrification Engineering Co., Ltd.